Entity Name: | CHACO'S CONSTRUCTION CORP. |
Jurisdiction: | Illinois |
Entity Type: | Corporation - Domestic BCA |
Status: | Dissolved |
Date Formed: | 23 Sep 2010 |
Date of Dissolution: | 10 Feb 2023 |
Company Number: | CORP_67241177 |
File Number: | 67241177 |
Type of Business: | All Inclusive Purpose |
Date Status Change: | 10 Feb 2023 |
Place of Formation: | ILLINOIS |
Name and Address | Role | Appointment Date |
---|---|---|
GUILLERMO ARAUZ, 1633 N WESTERN AVE, CHICAGO, 60647, COOK-NOT IN CITY OF CHICAGO | Agent | 2017-08-31 |
Name and Address | Role |
---|---|
FERNANDO DIAZ 327 FREMONT AVEROMEOVILLE IL, 60446 | President |
Class | Series | Voting Rights | Authorized Shares | Issued Shares | Par Value |
---|---|---|---|---|---|
COMMON | No data | Voting Rights | 100 | 100000 | No data |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342902814 | 0521700 | 2018-01-26 | 12424 71ST CT., PALOS HEIGHTS, IL, 60463 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260020 B01 |
Issuance Date | 2018-03-09 |
Abatement Due Date | 2018-04-25 |
Current Penalty | 1000.0 |
Initial Penalty | 1663.0 |
Final Order | 2018-03-28 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part. a. On or about January 26, 2018, at the above addressed jobsite, the employer did not maintain an accident prevention program to comply with the regulations of this part which included, but were not limited to employee protection when exposed to hazards related to commercial construction. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260021 B02 |
Issuance Date | 2018-03-09 |
Abatement Due Date | 2018-04-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2018-03-28 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a. On or about January 26, 2018, at the above addressed jobsite, employees were not trained in the recognition of jobsite hazards, which include but not limited to, the hazards related to commercial construction. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19260454 A |
Issuance Date | 2018-03-09 |
Abatement Due Date | 2018-04-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2018-03-28 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a. On or about January 26, 2018, at the above addressed jobsite, employees conducting masonry operations from a tubular welded scaffold scaffold was not trained to recognize the hazards associated with scaffolding. The employees were thereby exposed to the hazards associated with falls. |
Citation ID | 01002A |
Citaton Type | Serious |
Standard Cited | 19260100 A |
Issuance Date | 2018-03-09 |
Current Penalty | 2000.0 |
Initial Penalty | 2217.0 |
Final Order | 2018-03-28 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a. On or about January 26, 2018, at the above addressed jobsite, an employee working on the ground, below masonry activities, was not wearing a hard hat to protect against falling materials and debris. |
Citation ID | 01002B |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2018-03-09 |
Abatement Due Date | 2018-03-15 |
Current Penalty | 0.0 |
Initial Penalty | 3326.0 |
Final Order | 2018-03-28 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a. On or about January 26, 2018, at the above addressed jobsite, an employee performing masonry operations from a tubular welded frame scaffold, twelve (12) feet above the ground, was exposed to injuries from falls due to the lack of guardrails. |
Date of last update: 03 Mar 2025