342367901
|
0524200
|
2017-05-31
|
2157 W. IRVING PARK ROAD, CHICAGO, IL, 60618
|
|
Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2017-05-31
|
Emphasis |
L: FALL, P: FALL
|
Case Closed |
2023-10-16
|
Related Activity
Type |
Inspection |
Activity Nr |
1236812 |
Health |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 I |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-15 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Final Order |
2017-10-10 |
Nr Instances |
2 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. a) On May 31, 2017, employees were exposed to fall hazards while working on a red tubular welded frame scaffold that was not fully planked. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 C02 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Final Order |
2017-10-10 |
Nr Instances |
8 |
Nr Exposed |
3 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a) On May 31, 2017, employees were exposed to fall hazards while using a red tubular welded frame scaffold that did not have base plates. The scaffold legs rested on plywood on the sidewalk and over a drainage grate. b) On May 31, 2017, employees were exposed to fall hazards while working on a yellow tubular welded frame scaffold without base plates. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260451 C01 II |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Final Order |
2017-10-10 |
Nr Instances |
2 |
Nr Exposed |
3 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(1)(ii): Supported scaffolds with a height to base width ratio of more than four to one (4:1) were not restrained from tipping by installing guys, ties, and braces: a) On May 31, 2017, a red tubular welded frame scaffold in excess of the 4:1 height to base ratio was not secured to prevent tipping, exposing employees to fall hazards. b) On May 31, 2017, a yellow tubular welded frame scaffold in excess of the 4:1 height to base ratio was not secured to prevent tipping, exposing employees to fall hazards. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-15 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Final Order |
2017-10-10 |
Nr Instances |
2 |
Nr Exposed |
3 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) On May 31, 2017, employees were exposed to a fall of approximately eleven feet to the concrete sidewalk below while working from a yellow tubular welded frame scaffold without guardrails. b) On May 31, 2017, employees were exposed to a fall of up to 22 feet to the concrete sidewalk below while working from a red tubular welded frame scaffold without guardrails. |
|
Citation ID |
01005 |
Citaton Type |
Serious |
Standard Cited |
19260452 C02 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Final Order |
2017-10-10 |
Nr Instances |
2 |
Nr Exposed |
3 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.452(c)(2): Frames and panels were not secured together by cross, horizontal, or diagonal braces, or combination thereof, which secure vertical members together laterally: a) On May 31, 2017, employees were exposed to fall hazards when working from a red tubular welded frame scaffold that only had cross-bracing on one side of the scaffold. b) On May 31, 2017, employees were exposed to fall hazards when working from a yellow tubular welded frame scaffold that only had cross-bracing on one side of the scaffold. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19030019 C01 |
Issuance Date |
2017-11-13 |
Abatement Due Date |
2017-12-15 |
Current Penalty |
305.0 |
Initial Penalty |
305.0 |
Final Order |
2017-12-12 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: G.H. Tuckpointing Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 09/15/2017 01 02 09/21/2017 01 03 09/21/2017 01 04 09/15/2017 01 05 09/21/2017 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET). |
|
|
342368123
|
0524200
|
2017-05-31
|
2157 W. IRVING PARK ROAD, CHICAGO, IL, 60618
|
|
Inspection Type |
Prog Related
|
Scope |
Partial
|
Safety/Health |
Health
|
Close Conference |
2017-05-31
|
Case Closed |
2023-10-16
|
Related Activity
Type |
Inspection |
Activity Nr |
1236790 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19101200 E01 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-10-05 |
Current Penalty |
2173.0 |
Initial Penalty |
2173.0 |
Final Order |
2017-10-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
NOTE: Construction Reference: 1926.59 The requirements applicable to construction work under this section are identical to those set forth at � 1910.1200 of this chapter. 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) The employer did not develop a written hazard communication program in accordance with 29 CFR 1910.1200(e)(1) that would describe or include at least the following: 1) Requirement for labeling of containers of hazardous chemicals; 2) Material safety data sheet availability; 3) Training of employees; 4) A complete list of hazardous chemicals known to be present in the workplace; 5) Methods to inform employees of the hazards on non-routine tasks; and 6) Methods to inform other employer(s) of material safety data sheet availability; the labeling system and any precautionary measures to protect employees. On May 31, 2017, employees of G.H. Tuckpointing Inc. were exposed to hazardous materials, such as, but not limited to portland cement, when mixing mortar and filling the gaps between the bricks on the side of the building. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19101200 G01 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2017-10-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
NOTE: Construction Reference: 1926.59 The requirements applicable to construction work under this section are identical to those set forth at � 1910.1200 of this chapter. 29 CFR 1910.1200(g)(1): The employer did not have a safety data sheet (SDS) for each hazardous chemical which they used: a) On May 31, 2017, a SDS was not available for the brick and masonry cement (Essroc Cementi Brixment Type N Masonry Cement Type I) used by employees on site. |
|
Citation ID |
01001C |
Citaton Type |
Serious |
Standard Cited |
19101200 H01 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-10-05 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2017-10-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
NOTE: Construction Reference: 1926.59 The requirements applicable to construction work under this section are identical to those set forth at � 1910.1200 of this chapter. 29 CFR 1910.1200(h)(1): The employer did not provide employees with information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard was introduced into their work area: a) Employees were exposed to portland cement while mixing mortar and were not provided with information and training at the time of initial assignment. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260100 A |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
1630.0 |
Initial Penalty |
1630.0 |
Final Order |
2017-10-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.100(a): Employee(s) were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: a) On May 31, 2017, an employee was not wearing a protective helmet while working below another employee performing masonry work on a tubular welded frame scaffold. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260102 A01 |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
1630.0 |
Initial Penalty |
1630.0 |
Final Order |
2017-10-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation. a) On May 31, 2017, employees did not wear appropriate eye protection when mixing mortar and filling the gaps between the bricks on the side of the building. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19260095 A |
Issuance Date |
2017-09-11 |
Abatement Due Date |
2017-09-21 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2017-10-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, were not provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact. a) On May 31, 2017, employees did not wear gloves when mixing Essroc Cementi Brixment Type N Masonry Cement Type I with sand. |
|
Citation ID |
03001 |
Citaton Type |
Other |
Standard Cited |
19030019 C01 |
Issuance Date |
2017-11-13 |
Abatement Due Date |
2017-12-15 |
Current Penalty |
305.0 |
Initial Penalty |
305.0 |
Final Order |
2017-12-12 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: G.H. Tuckpointing Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01a 10/05/2017 01 01b 09/21/2017 01 01c 10/05/2017 01 02 09/21/2017 01 03 09/21/2017 02 01 09/21/2017 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET). |
|
|