Entity Name: | A & J CONSTRUCTION OF CENTRAL ILLINOIS, LLC |
Jurisdiction: | Illinois |
Entity Type: | Limited Liability Company |
Status: | Goodstanding |
Date Formed: | 19 Apr 2007 |
Company Number: | LLC_02179954 |
File Number: | 02179954 |
Type of Management: | Member Managed |
Date Status Change: | 25 Apr 2024 |
Address | 28478 ILLINOIS ROUTE 125, ASHLAND, 62612, IL |
Place of Formation: | ILLINOIS |
Name and Address | Role | Appointment Date |
---|---|---|
ANTHONY PEZOLD, 28478 ILLINOIS RT 125, ASHLAND, 62612, SANGAMON | Agent | 2015-03-24 |
Name and Address | Role | Appointment Date |
---|---|---|
PEZOLD, JULIA, 28478 ILLINOIS RT 125, ASHLAND, IL, 62612 | Manager | 2024-04-25 |
PEZOLD, ANTHONY, 28478 ILLINOIS RT 125, ASHLAND, IL, 62612 | Manager | 2024-04-25 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342583747 | 0524500 | 2017-08-24 | 31051 E 3200 N RD, DWIGHT, IL, 60420 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1255516 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260501 B04 II |
Issuance Date | 2018-01-02 |
Abatement Due Date | 2018-02-01 |
Current Penalty | 4346.0 |
Initial Penalty | 4346.0 |
Final Order | 2018-01-29 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(4)(ii): Each employee on a walking/working surface was not protected from tripping in or stepping into or through holes by covers: On or about August 24, 2017, employees working on the flat building were exposed to open holes in the floor and the employer did not ensure that the holes were protected. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19030019 C01 |
Issuance Date | 2018-03-19 |
Abatement Due Date | 2018-04-26 |
Current Penalty | 415.0 |
Initial Penalty | 415.0 |
Final Order | 2018-04-13 |
Nr Instances | 1 |
Nr Exposed | 4 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: On January 2, 2018, A & J Construction of Central Illinois, was issued citations and the employer did not verify, through written certification that each citation was abated. Abatement certification was not received for the following violations: Citation 1 Item 1 |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2015-06-05 |
Emphasis | L: FALL, P: FALL |
Case Closed | 2018-10-31 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260453 B02 V |
Issuance Date | 2015-06-30 |
Abatement Due Date | 2015-07-13 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2015-08-18 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.453(b)(2)(v): A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift: Employees were exposed to a fall hazard up to 25 feet while in the basket of an aerial lift and the employees did not wear a body belt or lanyard attached to the basket. |
Citation ID | 01002A |
Citaton Type | Serious |
Standard Cited | 19260760 A01 |
Issuance Date | 2015-06-30 |
Abatement Due Date | 2015-07-13 |
Current Penalty | 2800.0 |
Initial Penalty | 2800.0 |
Final Order | 2015-08-18 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.760(a)(1): Each employee engaged in a steel erection activity who is on a walking/working surface with an unprotected side or edge more than 15 feet (4.6 m) above a lower level shall be protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems or fall restraint systems: Employees were exposed to a fall hazard up to 25 feet while installing metal roofing and a suitable fall protection system was not being used. |
Citation ID | 01002B |
Citaton Type | Serious |
Standard Cited | 19260761 B |
Issuance Date | 2015-06-30 |
Abatement Due Date | 2015-07-13 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2015-08-18 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.761(b):The employer did not train each employee exposed to a fall hazard in accordance with the requirements of this section and ensure employee participation in the program: Employees were exposed to a fall hazard up to 25 feet while installing metal roofing and employees were not provided with training while engaged in steel erection activities on the fall protection system to be used. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19030019 C01 |
Issuance Date | 2015-10-26 |
Abatement Due Date | 2015-11-28 |
Current Penalty | 400.0 |
Initial Penalty | 400.0 |
Final Order | 2015-12-14 |
Nr Instances | 1 |
Nr Exposed | 2 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: On June 30, 2015, A & J Construction of Central Illinois, LLC, was issued citations and the employer did not verify, through written certification that each citation was abated. Abatement certification was not received for the following violations: Citation 1 Item 1 |
Citation ID | 02002 |
Citaton Type | Other |
Standard Cited | 19030019 D01 |
Issuance Date | 2015-10-26 |
Abatement Due Date | 2015-11-28 |
Current Penalty | 400.0 |
Initial Penalty | 400.0 |
Final Order | 2015-12-14 |
Nr Instances | 1 |
Nr Exposed | 2 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: On June 30, 2015, , A & J Construction of Central Illinois, LLC was issued citations and the employer did not verify, through documents that each citation was abated. Abatement documentation was not received for the following violations: Citation 1 Item 3a & b |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2014-10-01 |
Emphasis | L: FALL, L: PIV, P: PIV |
Case Closed | 2014-11-19 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100178 L04 III |
Issuance Date | 2014-10-23 |
Abatement Due Date | 2014-11-19 |
Current Penalty | 840.0 |
Initial Penalty | 1200.0 |
Final Order | 2014-11-17 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.178(l)(4)(iii): Refresher training, including an evaluation of the effectiveness of that training, shall be conducted as required by paragraph (l)(4)(ii) to ensure that the operator has the knowledge and skills needed to operate the powered industrial truck safely. On or about October 1, 2014 employees operating powered industrial trucks were not evaluated at least once within a three year period, exposing employees to the hazards associated with operating a powered industrial truck. Abatement certification is required of this item in accordance with the requirements of 29 CFR 1903.19(c). |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260095 D01 |
Issuance Date | 2014-10-23 |
Abatement Due Date | 2014-11-04 |
Current Penalty | 840.0 |
Initial Penalty | 1200.0 |
Final Order | 2014-11-17 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.95(d)(1): Except as provided by paragraphs (d)(2) through (d)(6) of this section, the protective equipment, including personal protective equipment (PPE), used to comply with this part, was not provided by the employer at no cost to employee(s). On or about October 1, 2014 the employer did not provide at no cost to employees personal protective equipment (fall protection harness) required to safely perform daily work duties. Abatement certification is required of this item in accordance with the requirements of 29 CFR 1903.19(c). |
Date of last update: 13 Mar 2025